Project Overview
Location:
vancouver
Timeline:
9 Months
Project Cost:
$56,000
Client’s Goals
The client wanted to modernize their space by converting a dated bathtub into a custom walk-in shower—a cleaner look, easier access, and a significant upgrade in everyday usability.
As part of the refresh, flooring was replaced throughout the unit:
tile in the entry, bathroom, and kitchen
engineered hardwood in the living area
carpet in the bedroom
They also wanted to update the kitchen by installing a new countertop and removing the existing two-step eating bar on the peninsula, creating a more open, functional, and contemporary workspace.