East Vancouver
5 Months
$260,000
Client's goals
The homeowners wanted to transform the main floor of their home into a brighter, more open space designed for everyday living and larger gatherings. The priority was removing a dividing wall, with the structure upgraded to safely carry the new open-concept layout, and at the heart of the design a spacious kitchen with a new island serving as both workspace and entertaining hub. They also wanted a cramped bathroom reconfigured, new flooring across the main floor and stairs, and a new gas fireplace as the living room's focal point.
Removing a main floor wall and upgrading structure for an open-concept layout
Creating a modern kitchen with a central island for gatherings
Reconfiguring and renovating the bathroom to improve function and comfort
Refinishing the main floor with new flooring throughout
Updating stairs with new flooring for a cohesive look
Staircase refresh
Installing a new gas fireplace as a feature in the living space
Overview
Roka Projects transformed the main floor of an East Vancouver home over five months, removing a dividing wall and upgrading the structure to carry a bright, open-concept layout centred on a new kitchen island. A cramped bathroom was reconfigured with space borrowed from an adjacent closet, its floor structure was rebuilt from above to protect the finished ceiling below, and new flooring runs through the main floor and up the stairs, finished off by a new gas fireplace in the living area.
Scope of work
Main floor dividing wall removed, with structure upgraded to carry the open-concept layout
Floor structure reinforced to a structural engineer's design, correcting questionable framing from a past renovation
New kitchen built around a central island
Bathroom reconfigured and renovated, gaining space from an adjacent oversized closet
Bathroom floor structure upgraded from above, protecting the finished ceiling below
New flooring installed throughout the main floor
Stairs refinished with new flooring to match
New gas fireplace installed in the living area
Challenges & Solutions
Questionable Framing From a Past Renovation
Challenge: Questionable framing from a past renovation: the home had been renovated before, and some of the framing decisions made back in the day were not up to carrying an open main floor full of guests.
Solution: We brought in our structural engineer to design the fix and reinforced the floor structure, so the new open-concept layout can comfortably handle large gatherings.
A Cramped Bathroom Layout
Challenge: A cramped bathroom layout: the existing bathroom was tight on space, leaving the toilet area cramped and uncomfortable.
Solution: We reconfigured the layout by borrowing square footage from an oversized closet in the adjacent room, creating a more spacious, functional bathroom without sacrificing the flow of the home.
An Undersized Floor Structure Beneath Finished Space
Challenge: An undersized floor structure beneath finished space: the bathroom's floor structure needed upgrading to current standards, but the ceiling below was already finished and the client wanted it left undamaged.
Solution: We tackled the structural reinforcement from the top side, upgrading the floor system without disturbing the finished space below, preserving the lower-level finishes while ensuring durability and safety.
Result
The main floor now works for both everyday life and a full house of guests: one open space flowing from the island kitchen to the fireplace, with new flooring tying the whole level and staircase together. The bathroom went from cramped to comfortable without stealing from the home's flow, and the floor beneath it all was reinforced to an engineer's design, so entertaining a large group is exactly what this space was built for.
BEFORE photos
Similar Projects
We completed a nine-month full interior renovation of a newly purchased Downtown Vancouver townhouse.
After a basement flood, the homeowners needed the underlying water problems solved and the home protected for the long term.
We rebuilt the structure beneath a suite entry in East Vancouver over two weeks in March, as part of the owner's suite legalization.
We replaced the aged rubberized driveway of a North Vancouver home near Edgemont Village with a new concrete driveway.
We rebuilt a deck over the garage of a Burnaby home after the original had failed.
It began as a fence that blew down in a storm and became a full exterior renovation when the fence turned out to be holding onto a rotting timber retaining wall, and the wall turned out to be holding up the neighbour's driveway.
It began as a fence that blew down in a storm and became a full exterior renovation when the fence turned out to be holding onto a rotting timber retaining wall, and the wall turned out to be holding up the neighbour's driveway.
More than a century old and renovated in stages by previous owners, this Cambie-area home had the character the family wanted to keep, but not the layout, structure or systems they wanted to live with for decades to come.
The owners wanted their galley kitchen to work better without major structural changes, with more light and a connection to the patio, and their main bathroom rebuilt around a walk-in shower.
A closed-off East Vancouver condo kitchen opened up by removing several walls, connecting kitchen, dining, and living into one bright space. When the walls came down, deteriorated copper piping came out too. Newer plumbing than the building now.
An unfinished East Vancouver basement, now a legal two-bedroom suite with its own kitchen, bathroom, and private entry. Re-graded drainage and certified asbestos removal made it truly legal. It runs as an Airbnb today.
A dated kids bathroom in Cloverdale, fully removed and replaced in six weeks. Durable, easy-care finishes that shrug off daily wear, plus the storage a busy family needs. Built to grow with the kids.
An East Vancouver home refreshed in one pass: a new kitchen with the laundry hidden in matching millwork, all 2.5 bathrooms redone to match, engineered wood across both levels. Two and a half months.
A North Vancouver home whose basement suite needed its own way in. Roka cut a new opening in the foundation and built the entry properly: concrete, drainage, stairs, and railings. Two months, and both households got their privacy back.
A leaning concrete retaining wall in Pitt Meadows, replaced with a simple wood wall in a single week. With redevelopment already planned, the owners needed a few more safe years, not a forty-year rebuild. The right call was the simplest one that worked.
A cracked support under this Vancouver carport and patio, repaired first. That work uncovered garage doors framed with no header at all, since reframed properly. New walkway and rebuilt stairs finished it in three weeks.
A buyer inspection flagged structural items on this Horseshoe Bay home. Roka priced the fixes so the deal could close, then completed them after possession. Deck rebuilt, staircase and gutters put right.
A Kitsilano condo refreshed front door to bedroom. A dated bathtub became a walk-in shower and new flooring runs throughout. The kitchen opened up with a new counter, all in six weeks.
An East Vancouver main floor opened up around a new island kitchen. A dividing wall came out and the structure below was reinforced to carry it. Reconfigured bathroom and a gas fireplace round it out.
A Delta main floor modernized around a new kitchen. A gas fireplace, feature wall, and new flooring throughout tie it together. Roof, attic, and chimney put right first.
A leaking West Vancouver patio, replaced with new concrete and a glass guardrail. A failing structural beam was reinforced underneath. Four months, solid from the ground up.
One Yorkwood Hills neighbour told the next. Roka converted a walk-in closet into a private ensuite, four units and counting. Each got its own layout and finishes.
A durable, kid-proof bathroom built to last. New doors, trim, paint, and carpet refreshed the whole upper floor. Six weeks, on budget.
A pool that would not hold water, even after another repair. New finish, fixed jets and light, rebuilt mechanical room. Every leak found and sealed.
A Commercial Drive condo made safer for aging in place. New kitchen finishes, an accessible bathroom, and vinyl tile throughout. Exposed Poly-B plumbing replaced too.
Window rot caught and repaired before it spread. New window and siding finished the wall right. Exterior stairs rebuilt for safety, in two weeks.
A century-old Kitsilano home's old bathtub, replaced with a custom walk-in shower. Asbestos abatement cleared the way first. One month, no surprises.
We renovated this condo bathroom just off Commercial Drive in six weeks: the bathtub came out and a custom walk-in shower took its place, joined by a new floating vanity, continuous tile running through the whole room, and a heated floor underfoot.
A False Creek condo refreshed top to bottom. New kitchen, two renovated bathrooms, and a fireplace-centred living room. Air conditioning added for the summer months.
A previous contractor cut into a structural shear wall, a real seismic risk. Roka restored it to engineered spec and rebuilt the bathroom right. One month, fully contained.