Burnaby
5 Weeks
$42,000
Client's goals
The deck over the garage had reached the end of its life. The surface was failing and water was getting into the structure below. The owners wanted it rebuilt properly and waterproof, with new railings, stairs, and a pergola with a privacy screen.
A deck that keeps water out of the garage below for good
Structure that is sound, with the rot found and fixed rather than covered
New wood railings, cedar stairs, and a pergola with a privacy screen
The house's siding and trim tied back in so the rebuild reads as original
Overview
Roka Projects rebuilt a deck over the garage of a Burnaby home after the original had failed. Opening it up showed why. The crew took the old deck out to the joists, replaced and reinforced the framing, and planed it flat before sheathing it for a new vinyl waterproof membrane. New cedar stairs and wood railings went on, with a wood pergola and privacy screen above, and the framing over the garage door was rebuilt while the deck was open. About five weeks from demolition to finished siding.
Scope of work
Two layers of old deck removed: fibreglass membrane, plywood, and the original deck beneath it, plus the old stairs and railings
Rotten outer rim joist and joists at the post penetrations cut out and replaced; rim joist doubled
Joists sistered, cross-blocked, and tied with A35 framing brackets; remaining old wood treated with preservative
Framing planed flat and re-sheathed as a base for the membrane
New vinyl waterproof deck membrane installed
New cedar stairs on new stringers, with treads stained
New wood railings, pergola, and privacy screen built on the deck
Framing over the garage door rebuilt in pressure-treated lumber with structural screws after rot was found; garage door removed and reinstalled by the door company
New combed fascia, flashings, and building paper; original siding labelled, removed, and reinstalled to tie the deck back into the house
CHALLENGES & SOLUTIONS
A deck hiding underneath the deck
Challenge: the first cut for a scope check found a second, older deck beneath the one the owners were walking on. Someone had built the new surface straight over the old one, fibreglass membrane over plywood over the original decking, double-nailed and tucked under the house framing.
Solution: Both layers came out, down to the joists. The strip that ran under the house framing had to be cut free piece by piece rather than pried, and the original layer had twice the nails of a normal deck, so demolition took longer than a single deck would have. Nothing was left to trap water between layers again.
Rot where the water had been going
Challenge: with the old decking gone, the outer rim joist and the joists around the old railing post penetrations were rotten, and the joist run had never been cross-blocked.
Solution: The rotten joists and rim were cut out and replaced, the rim doubled, the weak joists sistered, and the whole run cross-blocked and tied with framing brackets. The sound old wood that stayed was treated with preservative. Then the frame was planed flat so the new sheathing and membrane would sit on one true plane instead of following the old sag.
Rot over the garage door
Challenge: the same water had been running down into the framing above the garage door, which was supporting the door track.
Solution: Rather than patch around the door, we booked the garage door company to remove it, rebuilt the framing over the opening in pressure-treated lumber with structural screws, sheathed and flashed it properly under the fascia, and had the door reinstalled a week later. The owners emptied the garage for the week and we boarded the opening in between.
Making a rebuilt deck look like it was always there
Challenge: the deck sits against the house siding, and a membrane deck needs a clean, flashed transition to the wall.
Solution: The siding around the deck was labelled as it came off, so every piece went back where it belonged after the membrane and flashings were in. New combed fascia was set level to the siding lines, and the building paper and flashings were run so the wall sheds onto the membrane, not behind it.
Result
The deck is dry, flat, and sound. The garage below is protected by a proper membrane instead of a second deck laid over a failed one, the rot is out of the structure rather than hidden under a second layer, and the framing over the garage door will not be the next thing to fail. Above it, new railings, cedar stairs, and a pergola with a privacy screen turn what was a failing landing into an outdoor room the owners can use.
BEFORE photos
Similar Projects
We rebuilt the structure beneath a suite entry in East Vancouver over two weeks in March, as part of the owner's suite legalization.
We replaced the aged rubberized driveway of a North Vancouver home near Edgemont Village with a new concrete driveway.
We rebuilt a deck over the garage of a Burnaby home after the original had failed.
It began as a fence that blew down in a storm and became a full exterior renovation when the fence turned out to be holding onto a rotting timber retaining wall, and the wall turned out to be holding up the neighbour's driveway.
It began as a fence that blew down in a storm and became a full exterior renovation when the fence turned out to be holding onto a rotting timber retaining wall, and the wall turned out to be holding up the neighbour's driveway.
More than a century old and renovated in stages by previous owners, this Cambie-area home had the character the family wanted to keep, but not the layout, structure or systems they wanted to live with for decades to come.
The owners wanted their galley kitchen to work better without major structural changes, with more light and a connection to the patio, and their main bathroom rebuilt around a walk-in shower.
A closed-off East Vancouver condo kitchen opened up by removing several walls, connecting kitchen, dining, and living into one bright space. When the walls came down, deteriorated copper piping came out too. Newer plumbing than the building now.
An unfinished East Vancouver basement, now a legal two-bedroom suite with its own kitchen, bathroom, and private entry. Re-graded drainage and certified asbestos removal made it truly legal. It runs as an Airbnb today.
A dated kids bathroom in Cloverdale, fully removed and replaced in six weeks. Durable, easy-care finishes that shrug off daily wear, plus the storage a busy family needs. Built to grow with the kids.
An East Vancouver home refreshed in one pass: a new kitchen with the laundry hidden in matching millwork, all 2.5 bathrooms redone to match, engineered wood across both levels. Two and a half months.
A North Vancouver home whose basement suite needed its own way in. Roka cut a new opening in the foundation and built the entry properly: concrete, drainage, stairs, and railings. Two months, and both households got their privacy back.
A leaning concrete retaining wall in Pitt Meadows, replaced with a simple wood wall in a single week. With redevelopment already planned, the owners needed a few more safe years, not a forty-year rebuild. The right call was the simplest one that worked.
A cracked support under this Vancouver carport and patio, repaired first. That work uncovered garage doors framed with no header at all, since reframed properly. New walkway and rebuilt stairs finished it in three weeks.
A buyer inspection flagged structural items on this Horseshoe Bay home. Roka priced the fixes so the deal could close, then completed them after possession. Deck rebuilt, staircase and gutters put right.
A Kitsilano condo refreshed front door to bedroom. A dated bathtub became a walk-in shower and new flooring runs throughout. The kitchen opened up with a new counter, all in six weeks.
An East Vancouver main floor opened up around a new island kitchen. A dividing wall came out and the structure below was reinforced to carry it. Reconfigured bathroom and a gas fireplace round it out.
A Delta main floor modernized around a new kitchen. A gas fireplace, feature wall, and new flooring throughout tie it together. Roof, attic, and chimney put right first.
A leaking West Vancouver patio, replaced with new concrete and a glass guardrail. A failing structural beam was reinforced underneath. Four months, solid from the ground up.
One Yorkwood Hills neighbour told the next. Roka converted a walk-in closet into a private ensuite, four units and counting. Each got its own layout and finishes.
A durable, kid-proof bathroom built to last. New doors, trim, paint, and carpet refreshed the whole upper floor. Six weeks, on budget.
A pool that would not hold water, even after another repair. New finish, fixed jets and light, rebuilt mechanical room. Every leak found and sealed.
A Commercial Drive condo made safer for aging in place. New kitchen finishes, an accessible bathroom, and vinyl tile throughout. Exposed Poly-B plumbing replaced too.
Window rot caught and repaired before it spread. New window and siding finished the wall right. Exterior stairs rebuilt for safety, in two weeks.
A century-old Kitsilano home's old bathtub, replaced with a custom walk-in shower. Asbestos abatement cleared the way first. One month, no surprises.
We renovated this condo bathroom just off Commercial Drive in six weeks: the bathtub came out and a custom walk-in shower took its place, joined by a new floating vanity, continuous tile running through the whole room, and a heated floor underfoot.
A False Creek condo refreshed top to bottom. New kitchen, two renovated bathrooms, and a fireplace-centred living room. Air conditioning added for the summer months.
A previous contractor cut into a structural shear wall, a real seismic risk. Roka restored it to engineered spec and rebuilt the bathroom right. One month, fully contained.
An aging wood plank patio replaced with a long-term, low-maintenance solution that ends the yearly sanding and repainting.
A full home renovation with an open-concept main floor on steel beams, new kitchen, 4.5 bathrooms, new HVAC, and structural repairs throughout.