Pitt Meadows Wood Retaining Wall Replacement
Pitt Meadows
1 Week
$10,000
Client's goals
The homeowners were dealing with a failing concrete retaining wall that was leaning and becoming unstable. With the property already slated for future development, they did not want a long-term structural solution: the priority was a cost-efficient fix that would keep the wall safe and standing for a few more years, until redevelopment replaced it anyway.
Dealing with a failing, leaning concrete retaining wall
Prioritizing cost efficiency over long-term durability
A safe, practical solution good for a few more years
Keeping investment minimal ahead of planned redevelopment
Overview
Roka Projects replaced a failing, leaning concrete retaining wall in Pitt Meadows with a simple, cost-efficient wood retaining wall in a single week, for $10,000. The old wall was demolished, the site excavated as required, the new walls built and anchored with dead-heads, and everything put back together. Quick and easy by design: with redevelopment already planned for the property, the owners needed a safe wall for a few more years, not an engineered rebuild for the next forty.
Scope of work
Existing failing concrete retaining wall demolished
Excavation as required for the new walls
New wood retaining walls built, anchored with dead-heads
Site backfilled and put back together
Result
The leaning wall is gone and a straight, solid one stands in its place, sized to the property's actual future. The owners spent a fraction of an engineered rebuild's cost on a problem the redevelopment will erase anyway. Knowing when not to over-build is part of the job: the right fix here was the simplest one that worked.
BEFORE photos
Similar Projects
A closed-off East Vancouver condo kitchen opened up by removing several walls, connecting kitchen, dining, and living into one bright space. When the walls came down, deteriorated copper piping came out too. Newer plumbing than the building now.
An unfinished East Vancouver basement, now a legal two-bedroom suite with its own kitchen, bathroom, and private entry. Re-graded drainage and certified asbestos removal made it truly legal. It runs as an Airbnb today.
A dated kids bathroom in Cloverdale, fully removed and replaced in six weeks. Durable, easy-care finishes that shrug off daily wear, plus the storage a busy family needs. Built to grow with the kids.
An East Vancouver home refreshed in one pass: a new kitchen with the laundry hidden in matching millwork, all 2.5 bathrooms redone to match, engineered wood across both levels. Two and a half months.
A North Vancouver home whose basement suite needed its own way in. Roka cut a new opening in the foundation and built the entry properly: concrete, drainage, stairs, and railings. Two months, and both households got their privacy back.
A leaning concrete retaining wall in Pitt Meadows, replaced with a simple wood wall in a single week. With redevelopment already planned, the owners needed a few more safe years, not a forty-year rebuild. The right call was the simplest one that worked.
A cracked support under this Vancouver carport and patio, repaired first. That work uncovered garage doors framed with no header at all, since reframed properly. New walkway and rebuilt stairs finished it in three weeks.
A buyer inspection flagged structural items on this Horseshoe Bay home. Roka priced the fixes so the deal could close, then completed them after possession. Deck rebuilt, staircase and gutters put right.
A Kitsilano condo refreshed front door to bedroom. A dated bathtub became a walk-in shower and new flooring runs throughout. The kitchen opened up with a new counter, all in six weeks.
An East Vancouver main floor opened up around a new island kitchen. A dividing wall came out and the structure below was reinforced to carry it. Reconfigured bathroom and a gas fireplace round it out.
A Delta main floor modernized around a new kitchen. A gas fireplace, feature wall, and new flooring throughout tie it together. Roof, attic, and chimney put right first.
A leaking West Vancouver patio, replaced with new concrete and a glass guardrail. A failing structural beam was reinforced underneath. Four months, solid from the ground up.
One Yorkwood Hills neighbour told the next. Roka converted a walk-in closet into a private ensuite, four units and counting. Each got its own layout and finishes.
A durable, kid-proof bathroom built to last. New doors, trim, paint, and carpet refreshed the whole upper floor. Six weeks, on budget.
A pool that would not hold water, even after another repair. New finish, fixed jets and light, rebuilt mechanical room. Every leak found and sealed.
A Commercial Drive condo made safer for aging in place. New kitchen finishes, an accessible bathroom, and vinyl tile throughout. Exposed Poly-B plumbing replaced too.
Window rot caught and repaired before it spread. New window and siding finished the wall right. Exterior stairs rebuilt for safety, in two weeks.
A century-old Kitsilano home's old bathtub, replaced with a custom walk-in shower. Asbestos abatement cleared the way first. One month, no surprises.
We renovated this condo bathroom just off Commercial Drive in six weeks: the bathtub came out and a custom walk-in shower took its place, joined by a new floating vanity, continuous tile running through the whole room, and a heated floor underfoot.
A False Creek condo refreshed top to bottom. New kitchen, two renovated bathrooms, and a fireplace-centred living room. Air conditioning added for the summer months.
A previous contractor cut into a structural shear wall, a real seismic risk. Roka restored it to engineered spec and rebuilt the bathroom right. One month, fully contained.
An aging wood plank patio replaced with a long-term, low-maintenance solution that ends the yearly sanding and repainting.
A full home renovation with an open-concept main floor on steel beams, new kitchen, 4.5 bathrooms, new HVAC, and structural repairs throughout.
The homeowners wanted three of their bathrooms refreshed to feel brighter and more modern, while keeping the existing cabinets in place.