North Vancouver Kids' Bathroom and Upper Floor Refresh

Location

North Vancouver

Timeline

6 Weeks

Cost

$40,000

Client's goals

For this family, the goal was simple: a cost-efficient, durable bathroom their kids could use every day without worry. While the crew was in, the whole upper floor got a refresh to match.

  • A durable, kid-proof bathroom at a sensible budget

  • Practical, long-lasting finishes built for real-life wear and tear

  • Finishing carpentry throughout the upper floor: new doors, trim, and baseboards

  • Fresh paint upstairs in bright, kid-selected colours

  • New carpet throughout the upper level

Overview

Roka Projects renovated the kids' bathroom of a North Vancouver family home and refreshed the entire upper floor around it, all in six weeks. The bathroom was rebuilt with practical, long-lasting finishes chosen to handle daily use, after certified asbestos abatement cleared the way. Upstairs, finishing carpentry ran through every room: new doors, trim, and baseboards, painting throughout in colours the kids picked, and new carpet across the whole level.

Scope of work

  • Kids' bathroom fully renovated with durable, practical finishes

  • Certified asbestos abatement completed before construction

  • Finishing carpentry throughout the upper floor: new doors, door trim, and baseboards

  • Painting throughout the upper floor, in bright colours the kids picked themselves

  • New carpet installed throughout the upper level

Challenges & Solutions

Asbestos in the Bathroom Materials

Challenge: Asbestos in the bathroom materials: pre-project testing found asbestos, something we encounter regularly in homes of this age.

Solution: We handled it the way we always do: a certified abatement contractor remediated the area safely, and construction started on a clean foundation. No surprises, no delays, and no stress for the client.

Result

The kids have a bathroom that can take whatever they throw at it, and the upper floor feels like a new house: fresh doors and trim, rooms in colours the kids chose, and warm new carpet underfoot. A cost-focused project that still touched every room upstairs.


BEFORE photos

Similar Projects

Planning a Similar Project?

Previous
Previous

Yorkwood Hills Townhouse Ensuite Conversions

Next
Next

West Vancouver Pool Leak Repair and Restoration