Client's goals
The client had previously renovated their bathroom, but the former contractor had cut into a structural shear wall, a critical part of the building's seismic system. Nobody knew until a leak from that contractor's bathtub installation spread into the unit below and the strata's structural engineer investigated. His warning was blunt: "The lack of shear wall at the 2nd floor, coupled with the shear wall remaining at the 1st and 3rd floor, is the worst-case scenario for the seismic capacity of this portion of the building... There is risk of collapse during an earthquake as a result." Roka was hired to restore the shear wall to engineered specifications and rebuild the bathtub area properly, inside an existing, finished unit.
Restore the cut shear wall to the structural engineer's exact specifications
Rebuild the bathtub/shower area properly this time
Keep disruption to the finished unit and neighbouring units to a minimum
Leave the home safe, compliant, and structurally sound
Overview
A previous contractor's bathroom renovation had cut into a structural shear wall of this Vancouver townhouse, a defect the strata's engineer called the worst-case scenario for the building's seismic capacity, with risk of collapse in an earthquake. Roka Projects restored the wall to the engineer's exact specifications inside the finished unit, rebuilt the bathtub area properly, and completed the whole repair in one month with minimal disruption to the neighbours.
Scope of work
Compromised shear wall fully reinstated to the structural engineer's specifications
Work method planned and sequenced with the engineer for a confined, finished space4.5 bathrooms fully renovated
Bathtub/shower area rebuilt correctly
Leak damage from the previous installation addressed
Minimal disruption maintained for adjacent rooms and neighbouring units
Challenges & Solutions
Rebuilding a shear wall inside a finished unit
Challenge: Reinstating a structural wall in a tight, finished space, without major disruption to adjacent rooms or neighbouring units, demanded precision against the engineer's exact specifications.
Solution: We worked step by step with the structural engineer on a method to rebuild the wall safely within the confined space. It was detailed, sequenced work, and the wall was fully reinstated to engineered requirements with minimal impact on the surrounding areas.
Result
The building's seismic system is whole again, verified against the engineer's specifications, and the bathroom that caused it all is rebuilt the way it should have been the first time. For the client, a month of precise, contained work turned a collapse-risk warning into a closed file.
BEFORE photos
Similar Projects
A closed-off East Vancouver condo kitchen opened up by removing several walls, connecting kitchen, dining, and living into one bright space. When the walls came down, deteriorated copper piping came out too. Newer plumbing than the building now.
An unfinished East Vancouver basement, now a legal two-bedroom suite with its own kitchen, bathroom, and private entry. Re-graded drainage and certified asbestos removal made it truly legal. It runs as an Airbnb today.
A dated kids bathroom in Cloverdale, fully removed and replaced in six weeks. Durable, easy-care finishes that shrug off daily wear, plus the storage a busy family needs. Built to grow with the kids.
An East Vancouver home refreshed in one pass: a new kitchen with the laundry hidden in matching millwork, all 2.5 bathrooms redone to match, engineered wood across both levels. Two and a half months.
A North Vancouver home whose basement suite needed its own way in. Roka cut a new opening in the foundation and built the entry properly: concrete, drainage, stairs, and railings. Two months, and both households got their privacy back.
A leaning concrete retaining wall in Pitt Meadows, replaced with a simple wood wall in a single week. With redevelopment already planned, the owners needed a few more safe years, not a forty-year rebuild. The right call was the simplest one that worked.
A cracked support under this Vancouver carport and patio, repaired first. That work uncovered garage doors framed with no header at all, since reframed properly. New walkway and rebuilt stairs finished it in three weeks.
A buyer inspection flagged structural items on this Horseshoe Bay home. Roka priced the fixes so the deal could close, then completed them after possession. Deck rebuilt, staircase and gutters put right.
A Kitsilano condo refreshed front door to bedroom. A dated bathtub became a walk-in shower and new flooring runs throughout. The kitchen opened up with a new counter, all in six weeks.
An East Vancouver main floor opened up around a new island kitchen. A dividing wall came out and the structure below was reinforced to carry it. Reconfigured bathroom and a gas fireplace round it out.
A Delta main floor modernized around a new kitchen. A gas fireplace, feature wall, and new flooring throughout tie it together. Roof, attic, and chimney put right first.
A leaking West Vancouver patio, replaced with new concrete and a glass guardrail. A failing structural beam was reinforced underneath. Four months, solid from the ground up.
One Yorkwood Hills neighbour told the next. Roka converted a walk-in closet into a private ensuite, four units and counting. Each got its own layout and finishes.
A durable, kid-proof bathroom built to last. New doors, trim, paint, and carpet refreshed the whole upper floor. Six weeks, on budget.
A pool that would not hold water, even after another repair. New finish, fixed jets and light, rebuilt mechanical room. Every leak found and sealed.
A Commercial Drive condo made safer for aging in place. New kitchen finishes, an accessible bathroom, and vinyl tile throughout. Exposed Poly-B plumbing replaced too.
Window rot caught and repaired before it spread. New window and siding finished the wall right. Exterior stairs rebuilt for safety, in two weeks.
A century-old Kitsilano home's old bathtub, replaced with a custom walk-in shower. Asbestos abatement cleared the way first. One month, no surprises.
We renovated this condo bathroom just off Commercial Drive in six weeks: the bathtub came out and a custom walk-in shower took its place, joined by a new floating vanity, continuous tile running through the whole room, and a heated floor underfoot.
A False Creek condo refreshed top to bottom. New kitchen, two renovated bathrooms, and a fireplace-centred living room. Air conditioning added for the summer months.
A previous contractor cut into a structural shear wall, a real seismic risk. Roka restored it to engineered spec and rebuilt the bathroom right. One month, fully contained.
An aging wood plank patio replaced with a long-term, low-maintenance solution that ends the yearly sanding and repainting.
A full home renovation with an open-concept main floor on steel beams, new kitchen, 4.5 bathrooms, new HVAC, and structural repairs throughout.
The homeowners wanted three of their bathrooms refreshed to feel brighter and more modern, while keeping the existing cabinets in place.