East Vancouver Kitchen and Bathroom Renovation
East Vancouver
2.5 Months
$195,000
Client's goals
The client wanted their kitchen updated with a smarter layout, including a laundry closet incorporated into the new millwork. The project also refreshed all 2.5 bathrooms to match the home's updated look, and finished with new engineered wood flooring across both the main and upper floors for one cohesive, elevated feel.
A new kitchen with a more functional, streamlined layout
A laundry closet incorporated into the new kitchen millwork
All 2.5 bathrooms renovated to match the updated home
New engineered wood flooring across the main and upper floors
Overview
Roka Projects renovated this East Vancouver home over two and a half months: a new kitchen with a laundry closet built cleanly into the millwork, all 2.5 bathrooms refreshed to match, and engineered wood flooring laid across both the main and upper floors to tie the whole home together.
Scope of work
Full kitchen renovation with new millwork
Laundry closet built into the kitchen millwork
2.5 bathrooms renovated
Engineered wood flooring installed across the main and upper floors
Result
The kitchen now works harder than the old one, with the laundry hidden in plain sight behind matching millwork, every bathroom matches the home's new standard, and one flooring runs through both levels. A whole-home refresh delivered in one 2.5-month pass.
BEFORE photos
Similar Projects
A closed-off East Vancouver condo kitchen opened up by removing several walls, connecting kitchen, dining, and living into one bright space. When the walls came down, deteriorated copper piping came out too. Newer plumbing than the building now.
An unfinished East Vancouver basement, now a legal two-bedroom suite with its own kitchen, bathroom, and private entry. Re-graded drainage and certified asbestos removal made it truly legal. It runs as an Airbnb today.
A dated kids bathroom in Cloverdale, fully removed and replaced in six weeks. Durable, easy-care finishes that shrug off daily wear, plus the storage a busy family needs. Built to grow with the kids.
An East Vancouver home refreshed in one pass: a new kitchen with the laundry hidden in matching millwork, all 2.5 bathrooms redone to match, engineered wood across both levels. Two and a half months.
A North Vancouver home whose basement suite needed its own way in. Roka cut a new opening in the foundation and built the entry properly: concrete, drainage, stairs, and railings. Two months, and both households got their privacy back.
A leaning concrete retaining wall in Pitt Meadows, replaced with a simple wood wall in a single week. With redevelopment already planned, the owners needed a few more safe years, not a forty-year rebuild. The right call was the simplest one that worked.
A cracked support under this Vancouver carport and patio, repaired first. That work uncovered garage doors framed with no header at all, since reframed properly. New walkway and rebuilt stairs finished it in three weeks.
A buyer inspection flagged structural items on this Horseshoe Bay home. Roka priced the fixes so the deal could close, then completed them after possession. Deck rebuilt, staircase and gutters put right.
A Kitsilano condo refreshed front door to bedroom. A dated bathtub became a walk-in shower and new flooring runs throughout. The kitchen opened up with a new counter, all in six weeks.
An East Vancouver main floor opened up around a new island kitchen. A dividing wall came out and the structure below was reinforced to carry it. Reconfigured bathroom and a gas fireplace round it out.
A Delta main floor modernized around a new kitchen. A gas fireplace, feature wall, and new flooring throughout tie it together. Roof, attic, and chimney put right first.
A leaking West Vancouver patio, replaced with new concrete and a glass guardrail. A failing structural beam was reinforced underneath. Four months, solid from the ground up.
One Yorkwood Hills neighbour told the next. Roka converted a walk-in closet into a private ensuite, four units and counting. Each got its own layout and finishes.
A durable, kid-proof bathroom built to last. New doors, trim, paint, and carpet refreshed the whole upper floor. Six weeks, on budget.
A pool that would not hold water, even after another repair. New finish, fixed jets and light, rebuilt mechanical room. Every leak found and sealed.
A Commercial Drive condo made safer for aging in place. New kitchen finishes, an accessible bathroom, and vinyl tile throughout. Exposed Poly-B plumbing replaced too.
Window rot caught and repaired before it spread. New window and siding finished the wall right. Exterior stairs rebuilt for safety, in two weeks.
A century-old Kitsilano home's old bathtub, replaced with a custom walk-in shower. Asbestos abatement cleared the way first. One month, no surprises.
We renovated this condo bathroom just off Commercial Drive in six weeks: the bathtub came out and a custom walk-in shower took its place, joined by a new floating vanity, continuous tile running through the whole room, and a heated floor underfoot.
A False Creek condo refreshed top to bottom. New kitchen, two renovated bathrooms, and a fireplace-centred living room. Air conditioning added for the summer months.
A previous contractor cut into a structural shear wall, a real seismic risk. Roka restored it to engineered spec and rebuilt the bathroom right. One month, fully contained.
An aging wood plank patio replaced with a long-term, low-maintenance solution that ends the yearly sanding and repainting.
A full home renovation with an open-concept main floor on steel beams, new kitchen, 4.5 bathrooms, new HVAC, and structural repairs throughout.
The homeowners wanted three of their bathrooms refreshed to feel brighter and more modern, while keeping the existing cabinets in place.